Quality Assurance

As a manufacturer, Universal Systems SE, understands the importance of quality. That is why all of our hot melt application systems and components go through an extensive quality assurance process before they leave our facility.

Each technician at Universal Systems has a specialty. For example, building circuit boards, assembling tanks, building & testing pumps, building applicators, winding hoses, pressing in seals and assembling modules, pressing and drilling nozzles, etc. With over 10,000 parts in stock, quality assurance and having a double check (or even triple check) system in place is essential to ensure all of our customers are getting high quality products that will last for years.

Each technician takes immense pride in their work. However, even the best of the best need to be checked. Our typical QA process requires the build technician to go through their assembly process and initial each step, which confirms to the QA technician that they have in fact followed the correct order. This is important since most of the time our build technicians are building multiples of the same product at one time. We want to guarantee that a step is not skipped. After the build technician has initialed their paperwork, the product is then moved to the QA department. A QA professional is assigned to the project and reviews all of the key items on their checklist. Once the component QA is complete, the item is boxed, dated and initialed by the QA professional. The next time you receive an order from us, check to see that there is a green QA sticker with initials on it. That is your QA professional!

For any further questions regarding our QA process or if there are any technical questions you have about any Universal Systems product, please email sales@ussefl.com or call us at (561) 272-5442.

Read More

Chillers on Your Manufacturing Line

Now you may be asking yourself, why am I reading about chillers on a hot melt blog? The answer is easy, Universal Systems SE manufactures heated hoses that can be used for transferring many more substances other than glue. And when there are applications that do not include glue, the manufacturing lines may need chillers.

Our heated hoses, while mainly used for high speed packaging glue application, can also be used for heating and transferring a plethora of other materials. Our Teflon lined hoses can transfer anything from candy, make up, wax and much more! Depending on the use and application of different substances, the packaging line can be filling at high rates of speed. Heating and filling formed containers for candle wax, as an example, can be tricky because in this application the wax needs to cool quickly so that it can be formed, packaged and shipped out to end users. One of the most common questions we get in this situation is: How can I keep my forming operation running at a high-speed pace from start to finish? The answer here is chillers. Essentially how a chiller works is it is built into the conveyor line. So, the product would be heated in a melt pot, transferred through the heated hose, dispensed into containers, and then fed along a chiller that is built into the line. The product goes from hot to cool in a matter of seconds.

If you have any other questions on how we can help you keep your production lines running at high-speed capabilities, please reach out to sales@ussefl.com or call to speak with a technician (561) 272-5442.

Read More

Starting Back Up After a Pandemic

This is most definitely a new reality that we are all facing. Never before have so many companies had to shut down several, if not all, of their packaging lines because of a global pandemic. However, it was a scary and necessary measure taken to prevent further outbreaks of COVID-19. Now, as we slowly start to reopen as a nation, so does our packaging facilities. State by state, Governors are rolling out the reopening phases that each company, both essential and non-essential must follow.

With the reopening happening, that may mean you are going to run into a few speed bumps. As we all know, machines that typically run seven days a week, don’t like being shut down for three months. Especially if they are not shut down and cleaned out properly before they sat around idle. So, when you switch the power button back to “ON”, everything might not turn green.

In an effort to help with troubleshooting, we have put together a quick list of potential fixes.

1. CLEAN YOUR TANK. We cannot stress this enough. Even if your team drained the glue in the tank reservoir before shut down, there will still be old residue that will impact your restart. Cleaning your tank is fairly simple. First, make sure to detach all guns from the hoses before running the cleaner through. Utilizing our Purge Plus cleaner, fill the tank reservoir and heat. Place the end of the hose inside a bucket and flush the cleaner through the tank and out through the hose.
2. CHANGE ALL FILTERS. This includes both the tank filter and in-line gun filter. Starting with new fresh filters is the smart way to go.
3. NOZZLES MIGHT GET CLOGGED UPON INITIAL RESTART. Nozzles have small orifices that dispense the glue onto packages. If there is any left-over char in the tank from restart, the nozzles could get clogged up first. Try switching the nozzle to see if that fixes the issue.
4. REBUILD KITS. There are a few items that can be rebuilt on your adhesive melter system. For example, your pump. If you think that your seals have dried up from sitting idle through the down time, and you have a skilled mechanic trained to work on the equipment, try ordering a rebuild kit. This will save you money on purchasing a new pump.

If you experience any other issues during your restart, please call us directly at (561) 272-5442 and a technician will walk you through troubleshooting any issue. Stay Safe!

Read More

The Importance of Air Quality in Packaging

Air quality is important in all aspects of life, but for some reason usually overlooked in packaging lines. Almost all hot melt application equipment will require air to operate, especially if they are pneumatic. Universal Systems’ line of ProBilt™ hot melt equipment utilizes air in several different points of operation. The pneumatic pumps require air in order to shift the actuator and pump the glue through the system. Also, modules require air to open the piston and, in some cases, even to close the piston. Of the two operations in your hot melt application process that require air, it is most important for the pump to receive clean air.

Universal Systems pneumatic pumps are manufactured with extreme precision and delicacy. The most important part of the pump is the actuator, otherwise known as the shifter. The shifter’s main components are the spool and sleeve, which is how the shifter “shifts”. The spool and sleeve are machined in pairs, hand measured, calibrated, cleaned and assembled. The shifter is attached to the side of the pump. If you have a ProBilt™ tank and pump, take a look at the label on the side of the shifter. It reads: “The air supplied to the pump should be dry, filtered and non-lubricated.” If the air supplied to the pump, that goes through the shifter, is lubricated, your shifter will seize over time. The reason is that the oil in the air will build up in the millimeters of space between the shifter spool and sleeve, not allowing it to smoothly shift. If you do have unfiltered air running to your hot melt pump, we sell a ¼ NPT filter regulator that you can attached to the air lines and filter the air before it goes into the pump. Check it out on our website here.

If you have any questions regarding your pneumatic pump or modules, please call us at (561) 272-5442 and one of Universal Systems’ technicians will be happy to help. You can also email sales@ussefl.com.

Read More

The Importance of Graphite Seals & PTFE in Hot Melt Equipment

Graphite seals and PTFE are used in all of Universal Systems SE’s pumps and modules to increase the longevity and life of those products. But why? In order to understand how we can boast about the quality of our products, it is first important to understand the quality and reasoning behind using certain key components.

Graphite seals are used in both the pumps and modules to create a smooth seal for the piston to move seamlessly through. Below are a few bullet points that explain why this particular component is so important.

  • Excellent heat resistance – up to 500°F – most all hot melt adhesive systems will heat up to 450°F, so even if a packaging line runs at the highest temperature allowed by the system, the graphite seals will remain unscathed.
  • It has a medium to high pressure rating – the maximum operating pressure on any pump should not exceed 35 – 45 psi. The most common operating pressure is 20 – 25 psi. These seals are rated perfectly for this type of application.
  • Excellent abrasion resistance – some packaging lines are not run with the cleanest adhesives, so utilizing graphite seals allows for any adverse environmental condition.
  • Very resistant to chemicals – this allows the end user the ability to not only use multiple types of adhesives, but cleaners as well.
  • Excellent extrusion resistance in severe conditions.

If you are interested in learning more about the components used to manufacture Universal Systems line of ProBilt™ equipment, please call (561) 272-5442 or email tech@ussefl.com.

Read More

Keep Your Melter Clean

Keeping your hot melt adhesive system clean may seem like an impossible task. Take a look at your melter now, it is probably bronzed and blackened with old melted glue. Well guess what…that is what travels through your application system and onto your boxes. Also, do you see all of the little bits of blackened glue? That is called char, and it is a big problem for your equipment. Even though your melter looks like this now, it is possible to keep it clean “ish”. Now, this melter runs in a packaging line, most likely 8 – 12 hours per day, every day, so there is no way that tit is going to stay pristine or even look clean after its first use. However, there are a few tricks of the trade to keep your melter looking good and running even better for decades to come.

Universal Systems SE sells a product called Purge Plus™ that, when used properly, will clean almost any melter. The directions for use are simple:

  • Drain all hot melt from tank reservoir
  • Fill reservoir with Purge Plus™
  • Heat Purge Plus to 350°F – 375°F for approximately 45 minutes
  • Open tank drain valve and remove tank filter assembly
  • Slowly start pump and run Purge Plus™ through the tank manifold and into a meal container until reservoir is empty
  • Stop pump, replace filter assembly and close drain valve
  • Carefully wipe any remaining contaminants from tank reservoir
  • Add new hot melt and recirculate through system
  • Drain one cup from each hose

In addition to cleaning the tank reservoir and heated hot melt hoses, if you are running a ProBilt™ series melter, the exterior is manufactured out of 316 grade stainless steel. So, any stainless steel cleaner will shine the exterior of the tank.

For any additional questions about Purge Plus or how to properly clean your tank and hoses, please call a Universal Systems service technician at (561) 272-5442 or email tech@ussefl.com.

Read More

Have Spares on the Shelf

As we navigate through this pandemic of 2020, we are noticing more and more packaging partners not getting the budgets to do much of anything with their packaging equipment. Even with the increase in demand for consumer goods like toilet paper and hand sanitizer, many packaging lines have limited shifts due to social distancing guidelines, making sure to keep their employees safe and healthy. As the country starts to slowly re-open, so will packaging lines…and nothing good comes out of a glue pot that has been sitting idle for over 6 weeks. That is why our number one recommendation to all facilities, other than to clean the pots before restart, is to make sure to keep spares on the shelf!

The most common hot melt equipment that should be replaced upon restarting a line are tank filters and in-line filters. Those filters will help with any char that is created once the line starts back up and running again. Another recommendation is to clean the pot with Purge Plus. It is so important to get the old glue out of the pot, before putting the new pellets in. It is also smart to keep spare modules and nozzles on the shelf. Those items can easily clog with char. Luckily, Universal Systems keeps over 10,000 items in stock and on the shelf for easy shipment whenever you need them.

If you are getting ready to restart a line and have any questions on best practices or the steps you should take to ensure a smooth manufacturing process, please call to speak with a technical rep at (561) 272-5442 or email sales@ussefl.com.

Read More

When Consumers Can’t Open their Boxes

Have you ever purchased a case of soda or carton of coffee cups and can’t get the box open? Of course, we all have. In the packaging industry, especially for hot melt machine manufacturers, that is a red flag. Whenever we get a box that has too much hot glue on it means that the packaging line is not set up properly or not being cleaned regularly.

If you are wondering why too much glue means that the line is not set up properly or not being cleaned regularly it is because one of two issues is occurring (or sometimes even both). The first issue is most likely that the line operators and/or maintenance managers are not cleaning the tank regularly and the lines are clogging up with char, which will subsequently clog nozzles. Instead of cleaning the tanks and hoses, and replacing the tank filter and in-line gun filters, most operations just buy bigger nozzles. If the diameter of the nozzle orifice is larger, then it will allow through more bits of char and not clog up as easily. Unfortunately, this is not a long-term solution. Putting down more hot glue will drive up the amount that facilities spend on adhesive pellets, and ultimately the annoyance will trickle down to the consumer when they can’t get their box open. The solution is simple…utilize Purge Plus to clean your tank every 1,000 hours. For some facilities that could mean cleaning every quarter and for others that could be twice a year, it all depends on the facility. In addition to cleaning the tank and hoses with Purge Plus, make sure that the tank filters are changed every 500 hours. The in-line gun filters should be changed every 150 hours to ensure that no char travels into the gun applicator, through the module and nozzle and onto the box.

The second issue that could cause too much glue on boxes, is that the line was not set up correctly from initial purchase. A lot of cartoners have standard hoses, guns, modules and nozzles that will work for most case packers, but not for all. Make sure to take into consideration the temperature of your packaging facility (which can impact the adhesion and viscosity of the glue as it travels through the application process), the distance that the guns are to the box upon application, and the surface area of the box you are covering. The longer the bead of glue you place, the less likely you are to need a larger diameter nozzle. The shorter the range you are covering, you might need more glue to make sure that maximum adhesion occurs, which means you need a larger diameter nozzle.

If you think you are putting down too much glue on your packaging line and need help, call one of Universal Systems’ technicians at (561) 272-5442. We have the most knowledgeable technicians in the business that can help you with almost any question.

Read More

Heated Hoses Can Transport More Than Adhesives

While adhesive application is Universal Systems’ main focus, several of our customers utilize our heated hoses for more than just adhesive. Our standard line of ClearFlow™ heated hoses can heat up to 450 degrees, run at 240v and have a maximum operating pressure of 1500 psi. We also manufacture custom transfer hoses which run at 120v and typically transfer material that heats at a lower temperature. For example, cosmetics, wax and chocolate or candy.

There are several CPGs out there that utilize heated hoses for more than just packaging. Our hoses can transfer any of the following materials:

  • Cosmetics
  • Chocolate
  • Candy
  • Wax
  • Air
  • Vape Liquid
  • Polyethylene
  • Paint
  • Tar
  • Food Oils
  • Water
  • Ink

One of our clients is a great example of how versatile our hoses are. They are a cosmetic packaging company that recently utilized our services to bottle a hair gel product, specifically made for curly hair. Their conveyer worked methodically to fill the bottle with water, then moved to fill with the hair gel formula. The combination of water and product created a foam, which needed to be eliminated quickly in order to keep the process moving. A spurt of hot air down into the top of the bottle is just what was needed before capping. Our heated hoses transferred, not only the water and hair gel product, but also the hot air needed to eliminate the foam.

We also have several clients who utilize our entire hot melt system to heat wax pellets, transfer them through the heated hoses and fill plastic molds. After the wax is transferred into the form mold, it is then moved to a cooling tray to harden and get ready to package. A separate Universal Systems ProBilt™ system is then used to seal the product box and ultimately the case.

So, if you are interested in utilizing a ProBilt™ system or ClearFlow™ hose for more than just adhesives and final packaging, give us a call and we can help! Please call (800) 848-5018 or email sales@ussefl.com for more information.

 

Read More

Correct Hose Length

Case packing and sealing in packaging lines depends on several components to run steadily and reliably. In order for a system to run continuously at all times, each piece of equipment needs to be concisely installed. The usual suspects of precision engineering on your case sealer adhesive systems are the pump, applicators and nozzles. Most line operators undervalue the importance of heated hose length in the overall operation and efficiency of the line.

Heated adhesive hoses get attached to the hot melt tank and run from the tank to the application gun, which is mounted on the packaging line itself. Heated hoses are typically attached to the tank with a straight connector, but can have both a 45 degree or 90 degree connection option, depending on where the tank is placed on the line. The applicator plug at the end of the hose is also sent out as a straight connection, but can be switched to a 90 degree plug if needed. There are typically two – four hoses used on each packaging line. With a two hose line, one hose will run up the line, across the top and down to the applicators. This hose transfers the adhesive that will seal the top of the carton and is mounted using straps. The second hose will typically run straight along the side of the packaging line to seal the bottom of the case.  No matter how many hoses you run or how you mount them, it is very important to have the correct length hose.

Our technicians visit several packaging facilities each year, and their biggest take away is that most purchasing agents are ordering the wrong length hose. Typically, the hoses that we see are too long. They are either running extra length on the ground, which is a safety hazard, or there is excess hanging before the applicator connection, which can cause heating inconsistency issues. It is important to measure from the tank through the entire hose travel process, including mounting straps, before ordering. Universal Systems SE manufactures our ClearFlow™ line of heated hoses in 2 ft increments. So, if you measure 6 ft, order a 6 ft hose and if you measure 7 ft, order an 8ft hose. Make sure that you measure precisely! If need a hose longer than 24 ft, we can custom make you any length up to 50 ft.

To speak with a USSE representative about our ClearFlow™ hoses or to consult with a technician about the hose length you need, please call (800) 848-5018 or email sales@ussefl.com.

 

Read More